Skip to main content

Rachel Cooper Roof Replacement (180033)

Project Start and Completion Dates

  • Start Date: 8/1/2018
  • Completion Date: 10/1/2018

Type of Work

Removing existing built-up roof system and install new EPDM (rubber) roofing system.

Location of Work

Rachel Cooper Roof

Staging Area

The parking are on the East side of the building between RachelCooper, Metcalf Elementary School and Fairchild.

Periodic Noise/Odors/Interruptions

  • Saws, cranes, noises on the roof and glue.
  • The glue fumes according to the manufacturer are not hazardous to your health.

Accessibility, Health, and Safety Notes

  • Cranes are being used and materials being removed and brought to the site.
  • ADA parking will be located from the staging area to the west side of the building.

ISU Project Manager

Tony Herter
Phone: (309) 438-1927

Notes

This project has a lot of construction activity. Be aware ofconstruction activity around this building.