Science Lab Building - Upper South Roof Replacement (180066)
Project Start and Completion Dates
- Start Date: 9/1/2018
- Completion Date: 12/1/2018
Type of Work
Removing existing EPDM roof system and install new EPDM (rubber) roofing system.
Location of Work
Science Lab Building- Upper South Roof
Staging Area
The parking is on the east side of the building near the east entry
Periodic Noise/Odors/Interruptions
- Saws, cranes, noises on the roof and glue. The glue fumes accordingto the manufacturer are not hazardous to your health.
Accessibility, Health, and Safety Notes
- Cranes are being used and materials being removed and brought to the site.
- DO NOT WALK UNDER CRANES.
- ADA access from the east side of the building will need to be closed during the roofing project.
ISU Project Manager
Tony Herter
Phone: (309) 438-1927
Notes
This project has a lot of construction activity. Be aware of construction activity around this building.